Join Friends of Albany Parks and El Cerrito Green Teams and in their first trash/litter clean-up of 2016! They will be meeting at a scenic stretch of Cerrito Creek alongside El Cerrito Plaza to clean up the creek and surrounding areas as needed. All ages are welcome.
Sign up to volunteer today!
(510) 215-4350, green@ci.el-cerrito.ca.us or just show up!
Latecomers welcome. Meet near Trader Joe’s south side in El Cerrito Plaza. Tools, gloves and good company provided. Wear closed-toed shoes with traction and clothes that can get dirty.
Do you or your family ride, walk, roll, scoot or skate on the Ohlone Greenway? I’m sure you do, as the multi-use path on the Greenway is Albany’s Active Transportation Highway – over 1,000 trips per day on regular days when last counted several years ago!
The Parks & Rec Department is overseeing Greenway improvements so now’s the time to give input in order to have a better experience to stroll, roll or just hang out!

Do you or your family ride on the Ohlone Greenway? Now’s the time to give input to improve it!
The information with the Project Plans and what was discussed at previous meetings is at this link. However, the proposal will be updated based on feedback that they received at February 1, so people should come to see how it evolved!
At this meeting the consultants will have 35% designs for you to see and provide input. This is a crucial time in the planning process!
Preferred Concept plan that was presented to Council on February 1 included:
- Plaza area as presented in the 250K Focused amenities (Adventure play with climbing wall, fitness pod with 3 stations, both diagonal ramps, social path short cut to Solano
- Redwood Grove informal play area
- San Gabriel sculpture play
- Social paths
- 3 Creek paintings
- 3 fitness stations along Greenway with 2 pieces of equipment at each
- Dartmouth Circle improvements
- Orchards
- Public Art locations
A parcourse, wayfinding, art – all can have a positive effect on the experience, safety and atmosphere of strolling and rolling.
An orchard is proposed for the eastern edge of the Greenway. What a great idea… BUT if those trees are planted too close to the multi-use path, as was already done south of Dartmouth, they will drop debris on the path, encroach on the path itself and also invite more conflicts between people biking northbound & walking on the east dg path and people who are picking fruit.
Another point someone brought up was that some of the existing trees west of the path cast are planted directly between the overhead light and the path, casting shadows on the path and making the nighttime path experience more dangerous.
In short, as Albany’s Active Transportation Highway, the City must take care not to degrade this important function. If amenities to either side are to be added, it should be done with great care.
Please attend this meeting to give your input and improve the Ohlone Greenway for everyone – strollers, rollers, sitters, dog-walkers, and fruit-pickers!
**THE AGENDA AND 35% PLANS ARE HERE** (NOTE: 4.3 MB FILE)

Do you or your family ride on the Ohlone Greenway? Spend a few hours to clean it up for everyone…and get a free lunch!
Do you and your family use the Ohlone Greenway for fun and transportation? Sure you do!
Here’s a great opportunity to spend a few hours cleaning it up for everyone you know.
PLUS, you’ll get free pizza for lunch courtesy of Albany Community Foundation and a free Friends of Albany Parks t-shirt!
Kids are welcome – the more, the merrier!
So come on out for a few hours, meet your neighbors, have a free lunch and help our community!

Would you rather have the Bay Trail look LIKE THIS…
Do you and your family ride or walk on the Bay Trail? Then come on down to help clean it up for yourself and everyone…and get a free lunch for your time!
Join AS&R, Albany Community Foundation, Albany Rotary, and the City of Albany as we work together to clean-up and improve the Bay Trail in Albany. Between Buchanan Avenue and our border with Richmond, the Bay Trail runs along Freeway 680. This stretch receives a lot of trash from the
freeway, and is hard to access for servicing. A recent clean-up job has left this area in a much improved state, but there is work still to be done.

…OR LIKE THIS??
Join us as we paint over graffiti, sweep rocks off of the path, and trim trees to allow easy cycling access. Bring gloves, sunscreen, and a water bottle. Wear clothes you can paint in. Tools will be provided.
Rotary is covering supplies to $100, ACF is providing lunch, and the City will help with trash removal.
Meet at Buchanan and the Bay Trail, just west of the freeway underpass.

Bike Share’s coming to Berkeley soon!
Bike Share in the Bay Area will be bigger and better soon. With 7,000 bikes at full build-out, the system will have stations every few blocks in San Francisco; connect Oakland, Berkeley, and Emeryville; and extend the San Jose service area from the downtown core. It will link people to MUNI and BART, to jobs and schools, and all that the Bay Area has to offer.
The City of Berkeley has partnered with the Metropolitan Transportation Authority and Bay Area Motivate to launch bike share in Berkeley in 2017. Berkeley will have 400 bikes and 37 bike share stations. Bike share will create a 24-hour, regional transportation network for short, one-way trips. Bike share provides an easy way of making trips from your home to BART, from your office to lunch, to dinner and a friend’s house. The Bay Area Bike Share system expansion will also include Emeryville (100 bikes), Oakland (850), San Francisco (4,500) and San Jose (1,000.)
No, not in Albany yet, but hopefully the next expansion will include Albany, El Cerrito and Richmond.
The next step is public workshops, where neighbors sit around maps and discuss which station locations work best for their community. You are invited to review possible site locations and give input, which will be considered, along withcrowd-sourced suggestions and technical analysis.
There are two more opportunities to give input so take advantage of them!
West Berkeley: September 28, 2016 West Berkeley Public Workshop, 6 & 6:45pm at the Sierra Club
North Berkeley: September 29, 2016 North Berkeley Public Workshop, 6 & 6:45pm at the North Berkeley Senior Center

Bike Share’s coming to Berkeley soon!
Bike Share in the Bay Area will be bigger and better soon. With 7,000 bikes at full build-out, the system will have stations every few blocks in San Francisco; connect Oakland, Berkeley, and Emeryville; and extend the San Jose service area from the downtown core. It will link people to MUNI and BART, to jobs and schools, and all that the Bay Area has to offer.
The City of Berkeley has partnered with the Metropolitan Transportation Authority and Bay Area Motivate to launch bike share in Berkeley in 2017. Berkeley will have 400 bikes and 37 bike share stations. Bike share will create a 24-hour, regional transportation network for short, one-way trips. Bike share provides an easy way of making trips from your home to BART, from your office to lunch, to dinner and a friend’s house. The Bay Area Bike Share system expansion will also include Emeryville (100 bikes), Oakland (850), San Francisco (4,500) and San Jose (1,000.)
No, not in Albany yet, but hopefully the next expansion will include Albany, El Cerrito and Richmond.
The next step is public workshops, where neighbors sit around maps and discuss which station locations work best for their community. You are invited to review possible site locations and give input, which will be considered, along withcrowd-sourced suggestions and technical analysis.
There are two more opportunities to give input so take advantage of them!
West Berkeley: September 28, 2016 West Berkeley Public Workshop, 6 & 6:45pm at the Sierra Club
North Berkeley: September 29, 2016 North Berkeley Public Workshop, 6 & 6:45pm at the North Berkeley Senior Center
Have a gripe, an idea or some input about anything that would further cycling and pedestrian conditions here in Albany?
Then join us at our next meeting (every other month – odd-numbered months) where we discuss policy and projects, and talk about what’s going on in Active Transportation in Albany.
Have something you want to talk about? Request an Agenda Item in “comments” (scroll down to the bottom for the next meeting.
(This meeting is not on our usual 3rd Sunday in odd months. We will return to that schedule in March.)
Look forward to seeing you!
Have a gripe, an idea or some input about anything that would further cycling and pedestrian conditions here in Albany?
Then join us at our next meeting (every other month – odd-numbered months) where we discuss policy and projects, and talk about what’s going on in Active Transportation in Albany.
Have something you want to talk about? Request an Agenda Item in “comments” (scroll down to the bottom for the next meeting.
Look forward to seeing you!
Albany has a chunk of change to spend on improving creek access and quality. And it has to start spending it within a year or two to avoid substantial financial complications (its bond money from a measure passed in the 90’s, and the duration is running out). So the City has scheduled a public discussion at City Hall starting regarding which project(s) to pursue.
There are a couple that would improve active transportation: 1) path from Tenth to Eighth Street along Codornices Creek and 2) a bridge across Cerrito Creek at Adams. The potential project at Codornices Creek would close the last gap on the Codornices Creek path from San Pablo to the soccer fields west of Fifth Street (the path from San Pablo to Tenth is about to be built as part of the senior housing under construction there).

Help connect Adams Street in Albany…
The potential project at Cerrito Creek would allow people to walk east-west along Cerrito Creek from San Pablo to Pierce. Among other, this would benefit Albany High School students living on Pierce that currently ford the creek at Adams.

…with Carlson Blvd in El Cerrito and Richmond!
Amazingly, it would also remove the only barrier along a regional north-south cycling route stretching from near downtown Richmond to the West Oakland BART station and beyond. Most of the other cities along this route (Oakland, Emeryville, Berkeley, El Cerrito, and Richmond) have completed their segments and the only other city (Richmond) has completed a large portion of it contiguous with El Cerrito and approved a plan to complete the rest. In contrast, Albany has completed almost none of its segment.

Bridge the gap!
Consequently Albany is the only gap along the existing nine mile long route and the soon to be 12 mile long route. A bridge over Cerrito Creek between Adams and Carlson would literally bridge that gap.
If either of these active transportation projects, or other aspects of creeks is of interest to you, please attend the meeting to learn more and provide your input. Thanks.

These racks that AS&R bought are perfectly situated for folks who want to enjoy the beach, a hike or just enjoy the beautiful view.
Help give input to make the Waterfront even more enjoyable!
The Bay Conservation & Development Commission will hold a Hearing on the Albany Beach Project.
Albany Beach Restoration & Public Access Project (first review) is the first actual agenda item of the meeting.

Won’t it be nice when we have a Bay Trail Connection through Albany?
The Design Review Board will review the design by the East Bay Regional Parks District, Questa Engineering, and 2M Associates for the Albany Beach Restoration and Public Access Project in the Cities of Albany and Berkeley, adjacent to Golden Gate Fields. The project would enhance the existing beach and dunes and would create approximately 4,765 linear feet of new Bay Trail, overlooks, and a 20-space parking lot.
Link to Meeting Materials which includes exhibits for the above which is Item 4 (but the first actual agenda item) on the Tentative Agenda.