Marin/Buchanan Cycling Improvement

Project Update (February 13, 2013):

Aleida Andrino-Chavez (City of Albany’s Transportation Planner) provided us with this photo (sent by Ana Bernardes in Public Works who is overseeing the construction of the project).  Please note the new, improved curb-cuts at Buchanan/Pierce where the new cycling ramp / plaza meets the street.  Kudos to the City staff for making this happen!

new curb-cut with wider access to the ramp will accomodate cyclists and pedestrians traveling in opposite directions

new curb-cut with wider access to the ramp will accomodate cyclists and pedestrians traveling in opposite directions

 

I went to the project site this morning commuting to work and was very pleased to see the newly constructed curb-cuts into the new “plaza” area (where the ramp meets Buchanan/Pierce).  I see that the earlier curb-cut (at Pierce, illustrated in the photo below in the earlier post) is designed/constructed for pedestrians/wheel-chair folks who need to cross Pierce to access the sidewalk on the east side of that intersection and is in addition to the new curb-cuts on the plaza area.
Happily, the crew had already also removed the “wall” and that bollard (entry to the ramp), so i walked my bike onto the sidewalk (over the other new curb-cut at Pierce) then over the dirt onto the bike-pedestrian ramp before re-mounting my bike.  The construction crew was great… I thanked them for letting me through and for the quick pace of their work….
The progress of this project makes me very happy and thankful for having City staff who pay attention to the details and are flexible to accommodate necessary changes.
Cheers,
Sherie

 

Background on this project followed by the history of AS&Rs engagement are available at the bottom of this page.

24 June 2012

Council considered the 100% design for this project at its meeting on June 18th.  It approved the design with direction to staff to seek better accommodation for people walking and cycling through the intersection of Marin and San Pablo.  While the official motion did not specify the addition of the cycling lane along the right turn lane sought by AS&R, the context for the motion indicates staff should and will seek such a lane as a result of the motion.

During the staff report, the City Engineer showed the project design on Marin at San Pablo with a cycling lane and the necessary additional width of easement from UC shown in color.  This and other staff comments indicates highest level staff understand the issue now and will seek to correct it.  Key to this was staff conveying that the lane could be added as a change order, which provides considerably more time to work out the solution. The project must go to bid in the next few months, which was an extremely short timeline for adding the lane into the design otherwise.

The other motivation for Council’s broader motion is that staff made clear the right turn lane is not providing the desired improvement for people walking across San Pablo at this time either.  Staff’s hoped for improvement was a pedestrian leadoff phase.  This turns the walking sign green before signal for motorists traveling in the parallel direction turns green.  This allows users to occupy the crosswalk before motorists start moving, which improves motorists safely yielding right-of-way to crosswalk users as legally required.  Staff’s hope was that the intersection motorist capacity increase provided by the right turn lane would offset the motorist capacity decrease caused by implementing the pedestrian leadoff phase such that CalTrans would commit to implementing the latter (CalTrans controls San Pablo).

As mentioned below, CalTrans has not committed to implement this phase, but rather has replied that it will make a decision once the project is built.  Staff noted this, and noted that Albany has a separate grant for implementing cycling lanes on Marin from San Pablo to Cornell to the east.  The City had intended to pursue this after the Buchanan cycling improvement project west of San Pablo is completed, in part as a matter of staff capacity. This grant has funds for changing the signal at Marin and San Pablo, which are sufficient for adding a right turn signal head to control eastbound motorists.  This would provide a real benefit for users of the crosswalk across the south side of the intersection.

So to deal with the near term uncertainty that CalTrans is going to provide any benefit to crosswalk users in response to the addition of the right turn lane, staff suggested it could accelerate implementation of the next phase project in order to maximize the likelihood of benefit for those users.  Council’s motion was affirmed that staff should take this action as well.  Of course, even with money for significant signal changes, CalTrans still may balk at balancing this intersections function for a broader range of users.  AS&R will have to monitor the situation and take action if necessary.

18 June 2012

The photo below shows a cycling lane between right and through turn lanes for motorists, such as AS&R is seeking to have added to the Marin/Buchanan cycling improvement project. The City Council is considering approval of the final design, which lacks a cycling lane along the planned new right turn lane currently.

The view is looking to the east at Tennyson from Hesperian in Hayward (from Google Streetview).  Less than one fifth the percentage of workers cycles to work in Hayward as in Albany, yet Hayward got this done right while Albany is struggling.

14 June 2012

The first phase of this project is to improve cycling access along Marin/Buchanan from San Pablo to the existing path on the Buchanan overpass to the west.

Albany Strollers & Roller’s current concern with this project is the lack of a cycling accommodation relative to a planned additional lane on eastbound Marin west of San Pablo.  This additional lane is for motorists turning right onto San Pablo.  The map below illustrates the situation with the current plan.

Without a cycling lane in this location, people biking through eastbound on the road will either follow the curb, and potentially collide with right turning motorists (a “right hook” collision), or have to bike between two lanes of motorists traveling up to 30 miles per hour.  Consequently the right turn lane would degrade, rather than enhance, conditions for some cyclists. This would be an ironic outcome of this cycling improvement project, to say the least.

In addition, it is not clear why the City is paying to add this lane.  It is a required mitigation for the proposed University Village Mixed-Use Project (also known as the “Whole Foods” project).  If that project were built, the private developers would have to pay for installation of this lane.

If the cycling lane cannot be included, Albany Strollers & Rollers wants the right turn lane eliminated.

Please write the Albany City Council at cityhall@albanyca.org, attend the Council’s meeting on Monday, June 18th starting at about 8:30 pm and comment, and/or contact your favorite Council member to discuss this directly.

(15 June addendum: review of AS&R’s email exchanges with staff over the past three months recovered the information that staff decided to include the right turn lane in the hope it would motivate a commitment from CalTrans to change the signal phasing to accommodate people crossing San Pablo to and from the path in the future. Given CalTrans historic focus on accommodating motorists at the exclusion of everyone else, this was a risky strategy. Not surprisingly, CalTrans responded that it will not commit to changing the signal phasing, but will decide what to do after the lane is built.)

Project Background

The Marin/Buchanan cycling improvement project will close the gap in the cycling route between the end of the cycling lanes at Cornell on the east and the path on the Buchanan railroad overpass to the west.  The project will install cycling lanes between Cornell and San Pablo, a multi-use path along the south side of Marin and Buchanan from San Pablo to Pierce, a cycling lane in the westbound direction along this same segment, and sharrows on this segment in the eastbound direction. A signal at Pierce for path users will be installed to allows path users to be able to safely cross between the overpass and southside path.  In addition the westbound Buchanan “spur” street that connects from Buchanan to Cleveland will be closed at Pierce in order to make the path connection safer.

Overall drawings of the final design are available at http://albanyca.org/Modules/ShowDocument.aspx?documentid=20371.  However, these are difficult to read due to the patterning and symbology.  The drawings showing the 35% design options are much easier to read.  Those are available at http://albanyca.org/Modules/ShowDocument.aspx?documentid=9637.  This document shows the alternatives designed for different segments.  The City Council adopted Alternative 2 from the overpass to the USDA driveway, Option 1 along Ocean View Elementary School (the USDA driveway to Jackson), and Alternative 1 east of San Pablo (there was only one alternative from Jackson to San Pablo).  The alternatives selected were supported by AS&R.  Note the 35% plans do not show eastbound sharrows, which were added during the subsequent 100% design process.

The initial conceptual design was developed almost a decade ago by consultants TY Lin and Associates using funds ( tens of thousands of dollars) from the Metropolitan Transportation Commission (MTC). The 35% design was developed by a team of consultants led by AECOM (which had a different name at the time) paid for primarily by an approximately $300 thousand grant funded by Alameda County’s 0.5% sales tax to support transportation (Measure B). Albany funded the 100% design using its own funds. Most of the construction cost for phase 1 from San Pablo to the overpass is funded by a Congestion Management and Air Quality Improvement/Surface Transportation Program grant (a federal source) of $1.7 million from the MTC.  Most of the construction cost for phase 2 from San Pablo to Cornell is funded by a State Bicycle Transportation Account grant of $600 thousand.

The project will also be coordinated with power and communication utility undergrounding from the overpass to Masonic, which make both efforts more cost effective and result in additional safety improvements for the City (overhead power lines are seismic safety risk).

History of AS&R’s Engagement

During the design process, AS&R successfully advocated for the project to improve conditions both for people who prefer to cycle on the road as well as off the road on a path.  To this end AS&R suggesting including the west bound cycling lane and eastbound sharrows, both of which were adopted.  AS&R also advocated for study of Alternative 3 from the overpass to the USDA driveway.  This alternative consisted of having the new path cross under the overpass.  It was first mentioned in AECOM’s response to the City’s consultant selection notice, and became AS&R’s leading alternative because it did not require path users to cross the Buchanan motorist traffic at all.  At the time, closure of the westbound connection from Buchanan to Cleveland had not been even imagined as an option, so the two other alternatives proposed by the conceptual design (cross at Pierce or Taylor) both required crossing motorist traffic on this connector.

This option required crossing more of the USDA’s property near the overpass though.  The USDA opposed this option for various reasons cited through time (too close to the main building for security, too close to the main building with regard to future expansion, too close to the sensitive materials storage area under the overpass west of Cleveland).  AS&R vigorously advocated for this option to be studied none the less.  The consultant eventually offered it could study the option for $5,000 without having access to this portion of the USDA’s property, and the City provided the consultant the funds for the purpose. This led to the two options for this alternative shown on the 35% design.

This showed that the slopes of the new ramps under and along side the overpass to connect to the existing path were too steep to be feasible.  At about the same time this finding was brought forth, there was also the finding that the Buchanan to Cleveland connector could be closed to motorist traffic without significant impact.  This was based on a traffic count on the connector showing it was used by only about 800 motorists per day.  The idea to close this connector was a brilliant way out of the issue of how to make the south to north side crossing as safe as possible.  AS&R does not know if this was first dreamed up by someone on staff or the consultant team, but AS&R is grateful to this person and those that took it seriously enough to study.